Restore Kawasaki

#11: Assembly 2

#11: Assembly 2

The finish line in sight—tank, fairing, and final details


EPISODE
11 of 12

DIFFICULTY
Medium

TIME REQUIRED
1 day

Video Tutorial

Work Steps:

1

Body parts

The tank, side covers, and fenders are installed. Use new rubber grommets!

2

Electrics

Connect all lights, turn signals, and instruments. Check all functions.

3

Final checks

Check that all screws are tightened correctly. Test brakes and throttle response.

4

First start

Fill with fresh oil and fuel. The big moment: first engine start!

Almost There!

The finish line is in sight! The painted parts are finally mounted. The Kawasaki slowly takes shape and looks better than ever.

Pro Tip

Use microfiber cloths when handling painted parts. Fingerprints show immediately on fresh paint!

Similar Posts

  • #07: Paint the frame

    Project Kawasaki Drifter / Episode 07 #07: Paint the frame The centerpiece—the frame gets a fresh coat of paint EPISODE 7 of 12 DIFFICULTY Medium to Hard TIME REQUIRED 2-3 days Video Tutorial Recommended SET Frame Painting SET Go to Shop → Work Steps: 1 Rust removal Remove loose rust from the entire frame using…

  • #04: Paint body parts

    Project Kawasaki Drifter / Episode 04 #04: Paint body parts Finally, paint! The tank and side covers get their new paint job. EPISODE 4 of 12 DIFFICULTY Medium to Hard TIME REQUIRED 1-2 days Video Tutorial Recommended SET Base Coat & 2K Clear Coat SET Go to Shop → Work Steps: 1 Degreasing Wipe again…